Home > Support > Features


Application: Process
Version: v3.4
Tool: All

Records found: 6

Status: P: Pending, S: Suspended, C: Corrected, R: Not reproductible.

Select feature id:
Description contains:
Select application:
Select application version:
Select tool:

Tool acronyms: IN: Installation, LM: License management, PM: Project manager, BE: BPMN editor, BS: BPMN Simulator (BPSim), BX: BPMN eXecutor, BV: BPMN Validation (OBP), ME: MSC editor, MT: MSC tracer, TE: Text editor

Tool id description comment date status forecast
BE 4800 When editing the next symbol to connect, in the available choices, if the red cross is selected, it cancels everything. It could go back to the previous possible choices. This would be very helpful when one is not sure in which category the symbol is located.  Done. The red cross is no more displayed in sub-menus, but replaced with a blue left-pointing triangle, that goes back to the previous menu when clicked. Note that pressing the escape key or clicking outside the menu still cancels the insertion.  2025-04-23 C v3.4 
BE 4871 At present the only way to debug a deadlock in simulation is to save the log as MSC and replay it to the the end to get to the blocking state. It would be helpful if this blocking (end) state could be displayd directly without having to replay the trace.  Done. A new button (beside the Save as MSC) in the logs view displays the final execution state of selected log.  2025-03-05 C v3.4 
BS 4812 When the simulation results for a symbol are displayed, clicking on another one will reset the displayed result to the first one. It would be better to keep the displayed simulation result for the former symbol if it exists on the new selected one.  Done. When selecting a new symbol with a simulation result displayed, if a result for the same parameter is available on the newly selected symbol, this is the one that will be displayed. If it's not, the display switches to the first available result, just as it does today.  2025-04-24 C v3.4 
BS 4870 It would be helpful to include also message flows in critical-path when possible.  Done. Message flows are now included in the critical path.  2025-03-05 C v3.4 
BS 4836 It would be nice to have a status on triggers generation when it takes some time to do so.  Done. There is a warning generated during check and when trying to run a simulation.  2025-01-07 C v3.4 
PA 4925 After editing a weighted results in a performance analysis window, after the dialog is validated, the weighted results in the tree is unnecessarily collapsed.  Done. The configuration for the expanded & collapsed weighted results is now kept after edition.  2025-04-23 C v3.4